Supervisory Control and Data Acquisition System (SCADA) Design-Build Project, Port Arthur, TX

Jefferson County

Owner Reference: RFQ/RFP No. 2024-010

Bid Date: 12/17/2024 at 02:00pm

Pre-Bid: 12/04/2024 @ 10:00am

Trades: Supervisory Control & Data Acquisition (SCADA): Controllers, Process & Data Automation: Hardware/Software on High-Level Machiner, *A&E Architecture & Engineering Services: Professional, Consultant, Consulting & Planning Services

Jefferson County Drainage District No. 7 is referred to in Project documents as DD7, District, or Owner. The term “Project” includes the project management, coordination, survey, design, and construction of the DD7 Supervisory Control and Data Acquisition System (SCADA) System. The Project also includes the design and construction of SCADA equipment and components at each of the DD7’s 20 separate pump stations as well as the control center located at Pump Station 1, various level monitoring sites, retention pond sites, and diversion gates located throughout the District. Bonds required. Prevailing wages.

Kirby Johnson
 Login or create an account
 Login or create an account

Owner: Jefferson County DD7 Drainage District No 7 TX

Published 12/04/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.