Kendall County WCID #3A Transfer and Booster Station, San Antonio, TX

Kendall County

Owner Reference: R03481.017.0

Bid Date: 12/23/2024 at 02:00pm
1 Days until bid date

Pre-Bid: 12/11/2024 @ 02:00pm

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, *General Building Contractor GBC: Building Construction Services, Enclosed Structures; Opportunities for Subcontractors

The installation of a transfer and booster station, which serves the proposed Kendall County Water Control Improvement District #3A Offsite Water Extension infrastructure required for the construction of a residential subdivision unit. Bonds required. Prevailing wages.

Ashlee Davison
 Login or create an account
 Login or create an account

Owner: Kendall WCID3A Water Control & Improvement District TX

Published 12/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.