**NEW BID DATE & NEW PRE-BID MEETING**CMP Storm Pipe Replacement Project - Kerrville-Kerr County Airport, Kerrville TX

Kerr County

Owner Reference: Erv_Storm_Drain

Bid Date: 11/20/2024 at 01:00PM

Pre-Bid: 10/23/2024 @ 01:00PM

Trades: Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, *Landscaping Contractor: Grounds Maintenance Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor

The project consists of: a. Installation of Erosion Control Measures. b. HMAC and PCC Pavement Removal. c. Existing CMP and Set Removal. d. Installation of Dual 24" Class II RCP and Set. e. Tie RCP into Existing Storm Inlet. f. Regrading of Existing Channel to Accommodate RCP Extension. g. Installation of HMAC AND PCC Pavement Section above new RCP. h. Vegetation Establishment. i. - Centerline Striping shall be installed after cure period of HMAC has been met per P-620. Bonds required. Prevailing wages.

Andrew Munoz
 Login or create an account
 Login or create an account

Owner: Kerrville Kerr County Airport TX

Published 09/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.