Sandow MUD No. 1 Water Treatment Facilities Phase 1, Houston, TX

Milam County

Owner Reference: 064531814-01

Bid Date: 02/18/2025 at 02:00pm

Pre-Bid: 01/14/2025 @ 02:00pm

Trades: Water Well Construction, Watershed Improvements & Water Tables: Drilling, Installation & Repairs, Tank Services: Installation, Repair & Cleaning, Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Cont, Site Preparation, Sitework, Prep Work & Prepwork, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

Construction of water treatment facilities, including three remote well sites including one with a well replacement, ground storage tanks, booster pumps, filters, filter building, hydropneumatic tanks, dewatering system, supplier provided electrical equipment, structural pads, site work, and yard piping. This includes architectural, structural, electrical, and all appurtenances required to complete a fully functional system. Electrical equipment supplier scope of work shall be provided to the Contractor. Bonds required. Prevailing wages.

Jessie Qiu
 Login or create an account
 Login or create an account

Owner: Sandow MUD1 Municipal Utility District TX

Published 01/08/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.