Kinder Morgan Pipeline Drainage Improvements, The Woodlands, TX

Montgomery County

Owner Reference: G0002-0072-01

Bid Date: 12/10/2024 at 10:00am

Pre-Bid: 12/03/2024 @ 10:00am

Trades: Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The scope of work includes the import, compaction and grading of fill within a Kinder Morgan Pipeline easement. The contractor will be required to pump out existing standing water and complete probing of the gas line and finalize agreement with KM prior to mobilizing equipment, coordination with Kinder Morgan has occurred. The proposed swale will grade to a proposed E inlet and to a RCP which will be tunneled underneath Birnham Woods Dr. to an existing manhole. Bonds required. Prevailing wages.

David Cornyn c/o Quiddity Engineering, LLC
 Login or create an account
 Login or create an account

Owner: Montgomery County MUD88 Municipal Utility District TX

Published 11/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.