NEW BID DATE**City of Frost: TxCDBG Waste Water Treatment Plant Improvements, Dallas, TX

Navarro County

Owner Reference: CDV23-0091

Bid Date: 10/24/2024 at 10:30am

Estimate: $300,000

Trades: Wastewater Operator Certification: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Stat, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Concrete Repair & Restoration Services, including Gunnite & Grouting Contractor, Generator Contractor - Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems

The TxCDBG Waste Water Plant Improvements Project includes, but is not limited to: Installing 15yd3 dewatering container and concrete slab. Installing Polymer System. Install yard piping. Install flexbase pavement. Installing reinforced concrete pad for generator. Installing 80KW emergency diesel generator. Miscellaneous electrical improvements. Bonds required. Prevailing wages.

Carlos Aguilar c/o Freeman-Millican, Inc.
 Login or create an account
 Login or create an account

Owner: City of Frost TX

Published 10/09/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.