Turkey Peak Dam Brush Clearing, Austin, TX

Palo Pinto County

Owner Reference: 10109424

Bid Date: 12/02/2024 at 10:00am

Trades: Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Vegetation Control & Wildfire Prevention: Burning, Fire Prevention, Mitigation & Mastication, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The District is clearing woody vegetation within the Turkey Peak Dam and related spillway and roadway areas (Clearing Areas) to prepare for construction. The scope of this project is limited to woody vegetation clearing only and will not include the clearing of any structures with the exception of potential fence cutting or fence removal as needed, which will be considered incidental to clearing. Bonds required. Prevailing wages.

Lisa Singer
 Login or create an account
 Login or create an account

Owner: Palo Pinto MUD1 Municipal Water District TX

Published 11/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.