ID 732283
Parker County
Owner Reference: P5V
Bid Date: 12/11/2024 at 02:00pm
Pre-Bid: 10/30/2024 @ 09:00am
Trades: Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, Stone Masonry Contractor: Block Wall, Chimneys, Retaining Walls, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors
PLW Waterworks is requesting proposals from interested suppliers and subcontractors to perform specified scopes of supply on the construction of the Dr. Paul Phillips Water Purification Plant (DPPWPP) Expansion Project, a brownfield expansion from 14.0 MGD to 18.0 MGD average daily flow (ADF) water purification plant with provisions for a future expansion to 22 MGD for the CITY OF WEATHERFORD. The project will be designed and constructed in three phases – Phases II, III, and IV – and consists of new facilities including Process Building, Rapid Mix Vault, Backwash Holding Tank, Recycle Pump Station, GAC Contactors, Clearwell, High Service Pump Station, as well as upgrades and improvements to Retaining Wall, chemical systems, yard and plant piping, site civil elements, and the electrical distribution and controls system. Nearly every trade in the waterworks industry will be required. Bonds required. Prevailing wages.
Triston Young c/o PLW Waterworks, LLC
Login or create an account
Login or create an account
Owner: City of Weatherford TX
Published 11/25/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.