Development Plans for Horizon Lakes - Infrastructure - Phase 1, Allen, TX

Rockwall County

Owner Reference: MYT21457

Bid Date: 11/14/2024 at 02:00pm

Trades: Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Scope of work includes Earthwork, Walls, Erosion Control, Pavement, Water, Sewer, Storm, a Lift Station, and a Water Supply Plant. Bonds required. Prevailing wages.

Matt Atkins
 Login or create an account
 Login or create an account

Owner: Rockwall County MUD10 Municipal Utility District TX

Published 11/05/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.