ID 730486
Tarrant County
Owner Reference: 25-0035
Bid Date: 12/12/2024 at 02:00pm
21 Days until bid date
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
This project consists of installation of Phase 2 of 54” water main from Boat Club Road to Bonds Ranch Road. This project is the first phase of a three phase project to provide increased reliability for increasing and future growth and demand in the far North Fort Worth. In conjunction with this project, the northbound lane of Fleming Ranch Road will be constructed after the water main is installed. Bonds required. Prevailing wages.
Login or create an accountOwner: City of Fort Worth TX
Published 11/13/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.