Peach Street WWTP Train 1, 2, and 3 Improvements, Grapevine, TX

Tarrant County

Owner Reference: 001.22.01

Bid Date: 12/10/2024 at 02:00pm

Pre-Bid: 11/05/2024 @ 02:00pm

Estimate: $6,000,000 - $7,500,000

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet, Demolition Contractor, Building Moving, Wrecking & Hauling, Machinery and Pumps Contractor; Motors & Variable Frequency Drives (VFD's), *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

This project generally includes, but is not limited to, the following items at the Peach Street WWTP in Grapevine, Texas: Demolition of existing Train 1 Traveling Bridge Filters. Installation of new Train 1 Disc Cloth Filters. Installation of new Train 1 concrete driveway. Installation of new Train 1 Aeration Basin weir. Demolition of existing Train 1 motor control center. Installation of new electrical distribution and controls to support new Disc Cloth Filters. Connection of new Disc Cloth Filters Control Panel to Plant Control System. Installation of new instrumentation and controls to support new Disc Cloth Filters. Installation of new Train 2 concrete driveway. Demolition of existing Train 2 Aeration Basin diffusers. Installation of new Train 2 Aeration Basin diffusers. Installation of new Train 2 Aeration Basin effluent weirs. Installation of new Train 2 aeration header. Miscellaneous Train 2 modifications. Demolition of existing Train 2 wire, conduit, PLC cabinet, motor local disconnect switches, and instruments along with other electrical and instrumentation infrastructure. Demolition of Return Sludge Pump Variable Frequency Drive (VFD) units. Installation of new Return Sludge Pump VFDs. Installation of new Blower Local Disconnect Switch. Installation of other motor local disconnect switches. Installation of wire/conduit for both electrical distribution and controls as well as instrumentation and controls for two clarifiers. Installation of new electrical distribution and controls as well as instrumentation and controls to support the new Train 2 Aeration System. Installation of new Train 3 aeration header. Installation of new Train 3 Aeration Basin effluent weirs. Miscellaneous Train 3 modifications. Demolition of existing Train 3 wire, conduit, instruments along with other electrical and instrumentation infrastructure. Installation of new electrical distribution and controls as well as instrumentation and controls to support the new Train 3 Aeration System. Modifications to existing effluent flow structures. Installation of new Service Water Pump Station. Installation of new service water distribution system. Installation of new electrical distribution and controls as well as instrumentation and controls to support the new Service Water System. Incorporation of new equipment and any automated flow meters, mass meters, valves, and controls into the existing SCADA system. All other work shown or required by the Contract Documents to provide a complete and working system. Bonds required. Prevailing wages.

Kent Riker c/o Provenance Engineering, LLC
 Login or create an account
 Login or create an account

Owner: City of Grapevine TX

Published 11/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.