Lady Bird Lake Bore for Pedernales Reconductor , Austin, TX

Travis County

Owner Reference: IFB 6100 CLMC1056

Bid Date: 12/12/2024 at 03:00pm
18 Days until bid date

Estimate: $3,226,272.00

Trades: Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The Work consists of an approximate 1400 linear foot horizontal directional bore under Lady Bird Lake for the installation of a 36 inch outside diameter high density polyethylene casing pipe with 12 – 3 inch HDPE carrier pipe, including 2 electrical manholes, electrical duct bank and other incidental construction. Electrical conductors will be provided and installed by Austin Energy. Bonds required. Prevailing wages.

Francisco Gonzalez
 Login or create an account
 Login or create an account

Owner: City of Austin TX

Published 10/30/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.