Country Club Creek Wastewater Improvements (Metcalf-, Austin, TX

Travis County

Owner Reference: RFQS 6100 CLMP378

Bid Date: 12/03/2024 at 02:00pm
12 Days until bid date

Pre-Bid: 10/31/2024 @ 10:00am

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Renewal and relocation of approximately 12,000 linear feet of wastewater line along Country Club Creek between Metcalfe Road and Oltorf Street to address condition and capacity concerns. Work to be completed concurrent with WPD improvements. Bonds required. Prevailing wages.

Kevin Koeller
 Login or create an account
 Login or create an account

Owner: City of Austin TX

Published 10/30/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.