ID 731096
Travis County
Owner Reference: IFB 6100 CLMC743A
Bid Date: 12/12/2024 at 02:00pm
18 Days until bid date
Pre-Bid: 11/12/2024 @ 10:00am
Estimate: $6,040,300.00
Trades: Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Water and wastewater system upgrades in the area generally bound by MoPac (Loop 1) on the west, Greenlawn on the north, Burnet Road on the east, and Allandale on the south. The system upgrades will replace aging infrastructure. The water system replacements will include approximately 8290 linear feet of water lines in Polygon 225, Sub-area A. The wastewater upgrades include replacement of 1,644 LF of pipe, lining of 321 LF, 3,044 spot repairs, and 32 additional manholes. Bonds required. Prevailing wages.
Joshua Oeffinger
Login or create an account
Login or create an account
Owner: City of Austin TX
Published 11/18/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.