ID 731099
Travis County
Owner Reference: IFB 6100 CLMC1078
Bid Date: 12/12/2024 at 03:00pm
18 Days until bid date
Pre-Bid: 11/19/2024 @ 10:00am
Estimate: $19,200,000.00
Trades: Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Installation of approximately 9,400 LF of 36-inch diameter HDPE wastewater force main downstream of the Boggy Creek Lift Station, east of Hwy 183 near Linger Lane, Hergotz Lane, Thompson Lane, and Patton Lane. This project replaces a portion of the existing forcemain and extends it to a new discharge location on the Govalle tunnel. Includes 1,600 LF of horizontal directional drilling installation under the Colorado River, a vortex drop shaft, connection to an existing tunnel shaft, and cleaning of the wet well at Boggy Creek Lift Station. Bonds required. Prevailing wages.
Kane Wei
Login or create an account
Login or create an account
Owner: City of Austin TX
Published 11/18/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.