ID 732972
Travis County
Owner Reference: IFB 6100 CLMC930
Bid Date: 01/09/2025 at 02:00pm
18 Days until bid date
Pre-Bid: 12/03/2024 @ 10:00am
Estimate: $11,000,000.00
Trades: Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Traffic Signals, Traffic Calming, Intersection Automated Enforcement Systems, Speed Safety Camera Equipment, Controls/Monitoring
The Work consists of expansion of an existing 4-lane divided roadway to 6-lane divided from Mopac to Brodie Lane; Drainage improvements including storm water detention and water quality structures; shared-use paths, intersection improvements at Brodie Lane, technology upgrades to existing signals. Project Segment: SLGT-C2. Bonds required. Prevailing wages.
Cristina Acuna
Login or create an account
Login or create an account
Owner: City of Austin TX
Published 12/02/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.