Capital Of Texas Expressway (CAPEX) Water Quality Control, Austin, TX

Travis County

Owner Reference: RFQS 6100 CLMP380

Bid Date: 01/15/2025 at 02:00pm
24 Days until bid date

Pre-Bid: 12/17/2024 @ 10:00am

Trades: Stormwater Prevention Plan (SWPP), Regional Flood Planning Group (RFPG), Floodproofing & Flood Risk/Pollution Reduction

A stormwater control measure (SCM) will be designed and constructed to treat runoff from the CAPEX (I35 Expansion) project in coordination with TXDOT. The SCM is proposed to be a wetpond with trail improvements along with other recreational, ecological, and educational value.

Shivani Kesar
 Login or create an account
 Login or create an account

Owner: City of Austin TX

Published 12/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.