WCMUD No. 45 Phase 2 Detention Basin Excavation, Spoil Placement and Outfall to serve La Segarra, Houston, TX

Waller County

Owner Reference:  211-127-13 DST (I)

Bid Date: 01/10/2025 at 10:00am
8 Days until bid date

Pre-Bid: 01/03/2025 @ 10:00am

Trades: Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Earthwork & Paving Contractor: Resurface, Coat, Highway, Roads/Runways Bridges, Overpasses, Asphalt, Land Clearing, Trails/Paths, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

Project scope shall include the excavation of approximately 88,200 CY of earthen material to be placed, graded and compacted on site and 320 LF of 24”-66” RCP storm sewer. Bonds required. Prevailing wages.

EHRA Engineering
 Login or create an account
 Login or create an account

Owner: Waller County MUD45 Municipal Utility District TX

Published 12/18/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.