ID 734003
Webb County
Owner Reference: 2024-001
Bid Date: 01/16/2025 at 04:00pm
25 Days until bid date
Pre-Bid: 12/18/2024 @ 04:00pm
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Reservoirs, Lakes, Streams, Ponds, Channels, Water Barriers, Aquatic Plants, Wetland Restoration, Living Shorelines NAICS 562998, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor
Project includes the modification of an existing dam and installation of a multiple pipe outlet structure with concrete and rock rip-rap. Additional improvements include drainage extensions, and SW3P improvements for the Lago Dam Conversion to Regional Detention Pond area within the Webb County Drainage District No. 1 boundary. Bonds required. Prevailing wages.
Login or create an accountOwner: Webb County Drainage District No. 1
Published 12/09/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.