Atlas Ranch Groundwater Pump Station, Round Rock, TX

Williamson County

Owner Reference: 761-1854

Bid Date: 10/08/2024 at 11:00am

Pre-Bid: 10/01/2024 @ 11:00am

Estimate: $2,570,000

Trades: Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, Supervisory Control & Data Acquisition (SCADA): Controllers, Process & Data Automation: Hardware/Software on High-Level Machiner, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, *General Engineering Contractor GEC; Subcontractor Opportunities

Items of Work: Horizontal Centrifugal Direct Coupled High Service Pumps P-1, P-2 and P-3. Pump Station Access Drive including 10 inch Thick Compacted Flexible Base Material (Grade 1). Access Drive and Concrete Driveway Approach from the Paved Street to the Water Well No. 2 Wellhead. Site Grading for the Pump Station Site, Water Well No. 1 Site and Water Well No. 2 Site. 7 foot High Chain-Link Security Fence for Pump Station Site and the Water Well No. 1 Site. 7 foot High Chain-Link Security Fence for Pump Station Site and the Water Well No. 2 Site. 22 foot x 30 foot x 12 foot (Ceiling Height) “Conventional-Type Construction” Pump Station Building on Reinforced Concrete Foundation. Electrical Facilities for the Pump Station and Well Site. 3 inch and 4 inch Piping, Valves, Fittings, Water Meter, Air Release Valve, Sonic Water Level Measuring Device (reporting to SCADA) at the Well Head No. 1. 3 inch and 6 inch Piping, Valves, Fittings, Water Meter, Air Release Valve, Sonic Water Level Measuring Device (reporting to SCADA) at the Well Head No. 2. Electrical Facilities for the Pump Station and Well Site No. 1. Electrical Facilities for the Water Well Site No. 2. Diesel Fueled Emergency Generator including 24 hour Fuel Tank. SCADA System (Ignition Software). Bolted Steel Ground Storage Tank, Minimum Capacity of 187,640 Gallons from Floor to Top 16 foot Sidewall Height of Tank. OSHA Approved Safe-T-Climb Accessories for use with Exterior and Interior Ladders. Two – 2 Inch Taps through Ground Storage Tank Wall with Stainless Steel Ball Valves. 10,000 Gallon Welded Steel Hydropneumatic Pressure Tank (100 PSI ASME Design Pressure with 4:1 Safety Factor). Ten foot by Ten Foot FRP Modular Pre-Fabricated Chlorine Building. Chlorine Feed System. Trench Safety Plan and Systems for Yard Piping. Silt Fence for Erosion Control. Restoration and Revegetation. Construction Testing Services. Contractor Provided Construction Staking. Bonds required. Prevailing wages.

Cheryl Anderson
 Login or create an account
 Login or create an account

Owner: Atlas Ranch MUD1 Municipal Utility District No. 1 TX

Published 09/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.