Round Rock Water Treatment Plant Miscellaneous Improvements Project, Round Rock, TX

Williamson County

Owner Reference: RFP 24-526

Bid Date: 12/11/2024 at 05:00pm

Pre-Bid: 11/14/2024 @ 10:00am

Trades: Wastewater Operator Certification: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Stat, Demolition Contractor, Building Moving, Wrecking & Hauling, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

This project includes the demolition and construction of concentrated alum and polymer feed piping, alum day tanks, and associated instrumentation and appurtenances; demolition of Hydrofluorisilic bulk and day tank; construction of polymer bulk tank, polymer bulk and day tanks as well as associated instrumentation and appurtenances; demolition of existing 55-gallon polymer drum scales and associated appurtenances; demolition and construction of diluted alum and polymer piping, raw and settled water sample pipes, and various drain pipes; demolition and construction of mud valve stems, stem supports, and washdown water piping within existing sedimentation basins; construction of additional sample piping from various process points throughout the plant; additional sample pumps and associated control and electrical improvements, as well as a generator pad with associated conduit. Bonds required. Prevailing wages.

Adam Levy
 Login or create an account
 Login or create an account

Owner: City of Round Rock TX

Published 10/29/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.