Construction Services for Bagdad Terminus Pump Station, Leander, TX

Williamson County

Owner Reference: CIPS25-001

Bid Date: 12/19/2024 at 03:00pm

Trades: *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors, Demolition Contractor, Building Moving, Wrecking & Hauling, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

1. Purpose The City of Leander, herein after “City”, seeks to enter into an agreement with a qualified Individual, Firm or Corporation, herein after “Respondent”, to provide construction services for the delivery of the of the Bagdad Terminus Pump Station. 2. Background The Work consists of the removal and replacement of the existing Terminus pump station building. Removal and replacement of the existing 750,000-gallon ground storage tank with a 1.5 MG (million gallon) concrete tank. The addition of a new 24" water transmission line on Bagdad Road from the Terminus Pump Station to Crystal Falls Parkway, connecting to an existing 18" water line at Crystal Falls Parkway. The replacement of existing 12"-18” water lines with a new 16" waterline (the existing 12”-18” are to be abandoned in place, in addition to connecting distribution lines ranging in size from approximately 3”-12”. 3. Project Firm and Plans The design and construction management services for the Project are being provided by Huitt-Zollars, 9600 N. MoPac Expressway, Suite 420, Austin, TX 78759. Bonds required. Prevailing wages.

Kelly Wenzel
 Login or create an account
 Login or create an account

Owner: City of Leander TX

Published 11/02/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.