Murray Aquatic Center Outdoor Pool Rebuild, Murray, UT

Salt Lake County

Owner Reference: 24-42

Bid Date: 12/19/2024 at 03:00pm
28 Days until bid date

Trades: *A&E Architecture & Engineering: Professional Services, Consultant, Consulting & Planning Services

The purpose of this RFP is to enter into a contract to find a qualified Architectural firm to design and oversee construction of the Murray Park Aquatic Center. It is anticipated that this RFP will result in a single contract award to the responsive and responsible vendor with the highest score justified by the procurement code. The methodology or formula that will be used to determine the contract award is: Committee Evaluation. Proposal Evaluation Criteria 10% Responsiveness, providing all pertinent and required information. 25% Firm experience with pool design and construction 10% Qualifications and experience of principal employees assigned to project. 20% Schedule 20% Familiarity with project 15% Firm fee Length of Contract: Architectural plans must be complete and ready for formal bid prior to December 31, 2025. Construction of project is anticipated to begin in the fall of 2026. All construction phases (demolition, construction, and grand opening) within an 18–24 month period, depending on the budget, design complexity and weather conditions. Bonds required.

Amandah Maudsley
 Login or create an account
 Login or create an account

Owner: City of Murray UT

Published 11/08/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.