ID 734594
Utah County
Owner Reference: RFB 2024-008
Bid Date: 01/08/2025 at 11:00am
12 Days until bid date
Pre-Bid: 12/12/2024 @ 01:30pm
Trades: E100 - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Construction of the Highline Ditch Project. Remove and dispose of approximately 240 LF of metal plates and concrete cover. Furnish and install approximately 3610 linear feet of 24” HDPE solid wall pipe placed on top of the existing concrete culvert. Furnish and install anchors and steel straps approximately every 50 feet to secure the pipe. Furnish and install clean out boxes approximately every 500 feet. Relocate the 24” flow meter. Bonds required.
Janna Penrose
Login or create an account
Login or create an account
Owner: City of Springville UT
Published 12/11/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.