Evergreen Road & Taylor Road Sewer & Waterline Improvements, Henrico Co., VA

Henrico County

Owner Reference: 24-2764-10JL

Bid Date: 12/11/2024 at 02:00pm
20 Days until bid date

Pre-Bid: 11/19/2024 @ 10:00am

Trades: Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The Work consists of furnishing materials, equipment, and labor necessary for the installation of approximately 2,820 linear feet of 8-inch gravity sanitary sewer main, including sixteen (16) manholes, new site inspection ports (SIPs) and new service lateral installations, installation of approximately 1,925 linear feet of 12-inch water main, including associated interconnections, hydrants, new meter assemblies and new service line installations, associated appurtenances, and all associated clearing and grubbing, erosion control and surface restoration. Bonds required.

Jianchong Luo
 Login or create an account
 Login or create an account

Owner: County of Henrico VA

Published 11/18/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.