CMAR -ARPA - Main Pumping Station Improvements, Richmond, VA

Richmond City County

Owner Reference: 106960

Bid Date: 12/10/2024 at 02:00pm
19 Days until bid date

Trades:  *At Risk Construction Management CMaR, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The Wastewater Treatment Plant (WWTP) Main Pumping Station Improvements Project will involve a major refurbishment of the 65-year-old Main Pumping Station that will replace pumps, valves and electrical equipment, all while maintaining the operation of the WWTP. It is anticipated that the selected firm (the “Contractor”) will: •collaborate with City staff, •perform evaluations, •develop final biddable design plans and specifications, •assist with obtaining all necessary permits, •prepare O&M manuals and record drawings, and •provide services during bid, construction, start-up, testing, and warranty phases. Bonds required.

Erick Ramos
 Login or create an account
 Login or create an account

Owner: City & County of Richmond VA

Published 11/13/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.