ID 736426
Asotin County
Owner Reference: RFB 2024-02
Bid Date: 02/05/2025 at 04:30pm
28 Days until bid date
Pre-Bid: 01/07/2025 @ 11:00am
Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
A contractor is being sought to construct the designed fish habitat restoration project that includes installation of engineered log structures, bank terracing, side channel grading, boulder structures, livestock fence, and a livestock bridge crossing. DISTRICT will provide the livestock crossing bridge, streambed boulders, and all natural wood products specified for this project and should not be included in the proposed cost. This includes wood materials (rootwads, treetops, racking logs, slash, and piles) for woody structures including flow deflection jams, sweeper logs, bank rootwads, main channel single rootwads, and side Channel Logs. Contractor is responsible for biodegradable rope connections and non-galvanized cable staples for securing woody structures and should be included in the proposed cost. POP May 1, 2025, to December 30, 2025, with instream construction planned for July 15 to September 15, 2025, or shorter
Asotin County Conservation District
Login or create an account
Owner: County of Asotin WA
Published 12/30/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.