Component 4 South End / Bike Ped Access Bridges Project, Wenatchee, WA

Chelan County

Bid Date: 12/05/2024 at 11:00am
1 Days until bid date

Pre-Bid: 11/12/2024 @ 11:00am

Estimate: $11.5M - $12.5M

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Work includes the construction of bridges, approaches and associated site improvements at two locations: one in Wenatchee over BNSF Railway (West Bridge) and one in East Wenatchee over SR28 (East Bridge) The west bridge will consist of a concrete ramp to Hale Park and to the existing W.T. Clark Pipeline Bridge. A 116’ prefabricated steel truss over BNSF rail will connect to a concrete helical ramp to South Columbia St and Bridge St. A secondary elevated, pier-supported access ramp will spur off the north side of the new west b ridge, terminating along the west side of Hale Skatepark. The East Bridge will consist of a pavement and concrete ramp on the Columbia SE River side of SR28, and two 177’ prefabricated steel trusses over SR28, landing into the 9th St Park Plaza. DBE goal 13%; 1600 hour training goal. Bonds required. Prevailing wages.

Purchasing
 Login or create an account

Owner: City of Wenatchee WA

Published 10/29/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450