Terminal 3 Drainage Project, Vancouver, WA

Clark County

Owner Reference: 24 - 44

Bid Date: 10/10/2024 at 02:00pm
20 Days until bid date

Pre-Bid: 10/01/2024 @ 01:00pm

Estimate: $75,000 - $100,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

The Terminal 3 Drainage project modifies the Terminal 3 Stormwater Drainage System to capture more stormwater and send it to treatment. Work includes but is not limited to installation of trench drain with associated concrete work, connecting the installed trench drain to the storm drain system, extruded curb, and one HMA speed bump. Bonds required. Prevailing wages.

Procurement
 Login or create an account
 Login or create an account

Owner: Port of Vancouver WA

Published 09/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.