ID 722485
Clark County
Owner Reference: 24 - 44
Bid Date: 10/10/2024 at 02:00pm
20 Days until bid date
Pre-Bid: 10/01/2024 @ 01:00pm
Estimate: $75,000 - $100,000
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities
The Terminal 3 Drainage project modifies the Terminal 3 Stormwater Drainage System to capture more stormwater and send it to treatment. Work includes but is not limited to installation of trench drain with associated concrete work, connecting the installed trench drain to the storm drain system, extruded curb, and one HMA speed bump. Bonds required. Prevailing wages.
Procurement
Login or create an account
Login or create an account
Owner: Port of Vancouver WA
Published 09/17/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.