Glenwood Pump Station ARV Replacement, Vancouver, WA

Clark County

Owner Reference: 26-2021-0030

Bid Date: 10/22/2024 at 10:00am

Estimate: $1.2M

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The work consists of improvements to the existing pump station and its forcemain, including temporary erosion control measures, traffic control as necessary, installing, testing, and commissioning two surge tanks at the pump station, furnishing and installing at the pump station valves, piping, instrumentation, and appurtenances, demolition and replacement at the pump station of the existing valve vault top section and hatch, furnishing and installing at two remote locations along the forcemain air release and/or vacuum relief valves, one location to install a concrete vault with a connection to the existing forcemain, startup, testing, commissioning, and other items. Bonds required. Prevailing wages.

Bob Sanguinetti
 Login or create an account
 Login or create an account

Owner: Clark Regional Wastewater District (CRWWD) WA

Published 10/05/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450