Prequalification for Priest Rapids Spillway Stability Improvement Project, Grant Co, WA

Grant County

Owner Reference: PREQUAL-230-12453

Bid Date: 11/18/2024 at 02:00pm
60 Days until bid date

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

Scope includes: Improvements are required to increase the stability of Priest Rapids Dam spillway. The Scope for remediation includes installing 38 post-tensioned anchors through the concrete ogee sections of multiple spillway monoliths, into the underlying bedrock foundation. Logistical support for access will include Contractor design and installation of working platforms, crane and barge support, and providing temporary traffic control. Designation as pre-qualified Contractor is required for Contractors to be eligible to bid as a Prime Contractor on the proposed Priest Rapids Spillway Stability Improvement Project. This Contractor Pre-qualification is to prequalify applicants as Prime/General Contractors or Joint Ventures experienced in the business of installing post-tensioned rock anchors for dams. Application attached.

Logan Castle, email only
 Login or create an account
 Login or create an account

Owner: Grant County Public Utility District (GCPUD) WA

Published 09/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.