On-site Grinder Pump Installations Phase 4 – Stage 2, Port Hadlock, WA

Jefferson County

Owner Reference: 405-2127-0, Bid no 09252024

Bid Date: 10/30/2024 at 02:00pm

Pre-Bid: 10/16/2024 @ 09:00am

Estimate: $1.3M - $1.5M + WSST

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

This contract provides for the construction of the second stage of on-site grinder pump installations for the Port Hadlock Wastewater System in Port Hadlock, Washington. Work includes on-site grinder pump installation within approximately 26 properties which include the connection to the low pressure sewer collection system; the installation of the 2-inch “side sewer” pipe, grinder pump; control panel; the connection to the existing building drain and appurtenances; pump start up and testing; abandoning of the existing septic tank; clearing and grubbing; hot mix asphalt, and other work. Bonds required. Prevailing wages.

Purchasing Department
 Login or create an account
 Login or create an account

Owner: County of Jefferson WA

Published 10/10/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.