Windtree Water Main Improvements, Newcastle, WA

King County

Bid Date: 09/05/2024 at 01:00pm

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Pipeline Contractor: Water Mains, Sewer Lines, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera

Work includes replacing approx. 1,200 LF of the existing 6” and 8” cast iron water main with new 12”, 8”, and 4” ductile iron water main. Other work includes replacement of fire hydrants, installation of an air and vacuum release valve assembly and blow off assemblies, replacement of 22 water services, and roadway restoration Bonds required. Prevailing wages.

Bill Reynolds
 Login or create an account
 Login or create an account

Owner: Coal Creek MUD Municipal Utility District (CCUD) WA

Published 08/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.