Electrical Panel Replacement at Meadowbrook Apartments, Shoreline, WA

King County

Owner Reference: DW2403031

Bid Date: 10/03/2024 at 02:00pm
13 Days until bid date

Pre-Bid: 09/16/2024 @ 10:00am

Estimate: $294,000

Trades: High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers

Work includes, but is not limited to: 1. Electrical Panels a. Disconnect power to existing panels. b. Remove existing panels. c. Enlarge wall opening for new panels. d. Install new 125 amp load center. e. Connect all circuits to existing feeders and label panel. f. Patch GWB, tape, sand & paint to match. g. Note: In 1408, Unit 26, there are 2 panels to be replaced. 1 of the replacement panels serves Unit 25. Convert existing Unit 25 replacement panel in Unit 26 into a junction box to serve Unit 25, and install a new panel in Unit 25 with jumper conductors from the Unit 26 junction box to new panel in Unit 25. h. See 03-Specifications Meadowbrook Elec Panel Spec for details. i. All units to be back on line with electrical service restored at the end of each work day. and other tasks as listed in the bid documents. Bonds required. Prevailing wages.

Michelle Jackson
 Login or create an account
 Login or create an account

Owner: King County Housing Authority (KCHA) WA

Published 08/27/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.