ID 722351
King County
Bid Date: 10/03/2024 at 11:00aM
13 Days until bid date
Estimate: $345,000
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
Project includes construction of approx. 145 LF of water main from the connection of the Sallal Well 2 CT line to the City’s Hobo Springs line connection across cedar Falls Way. In addition, it will include replacement and upgrade of electrical components inside the SCADA and telemetry cabinet, reactivation of the existing flow meter in the existing meter vault, and removal of an existing bypass line and clay valve in the existing meter vault. Bonds required. Prevailing wages.
Public Works
Login or create an account
Login or create an account
Owner: City of North Bend WA
Published 09/16/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.