Denny Way Preservation, Seattle, WA

King County

Owner Reference: PW#2023-049, CRRSAA-STBGUL-1602(030)

Bid Date: 11/06/2024 at 02:00pm

Estimate: $4.8M - $5.2M

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Project includes roadway pavement, pedestrian safety upgrades, select areas of sidewalk repair, metro and transit upgrades, channelization, and signal and drainage improvements. The roadway pavement involves removal and replacement of the asphalt overlay with select areas of concrete panel and base repair. The pedestrian safety upgrades include the installation of compliant curb ramps and concrete, paint-and-post, or plastic curb-and-post curb bulbs at select intersections to shorten crossing distances. Signal improvements include the installation of “no turn on red” signage and signal loop replacement. The metro and transit upgrades include the consolidation of stops and in-lane concrete bus pads at bus stops along Denny Way. For the purpose of the Bidder/Subcontractor List, this project includes rebar installation and electrical work. 15% mandatory DBE goal.

Kari Frizzell
 Login or create an account
 Login or create an account

Owner: City of Seattle Department of Transportation WA

Published 10/09/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.