ID 728841
King County
Owner Reference: 24-22
Bid Date: 11/21/2024 at 02:00pm
Bids Today
Pre-Bid: 11/12/2024 @ 10:00am
Estimate: $3.7M - $4.3M
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Schedule A: 1 new pressure reducing valve station, 20 LF of new 14-inch DI water main, 4,605 LF of new 8-inch DI water main, 50 LF of new 6-inch DI water main, 165 LF of new 4-inch DI water main, 13 fire hydrants, 4 air vacuum release assemblies, 1 blowoff assembly, 89 water services, 5 connections to existing water main, concrete driveway, timber stair replacement, and HMA trench patching. Temporary erosion/water pollution control, temporary traffic control and devices, property restoration and other miscellaneous items will also be necessary to complete the work. Schedule B: 1,460 LF of new 8-inch DI water main, 35 LF of new 6-inch DI water main, 2 fire hydrants, 1 air vacuum release assembly, 13 water services, 4 connections to existing water main, temporary water main, soldier pile retaining wall, and HMA trench patching. Temporary erosion/water pollution control, temporary traffic control and devices, property restoration and other miscellaneous items will also be necessary to complete the work. Schedule C: 325 LF of new 12-inch DI storm main, 165 LF of new 8-inch DI storm main, connections to existing storm main, 12 Type-I catch basins, 2 Type-II catch basins, concrete driveway, and HMA trench patching. Temporary erosion/water pollution control, temporary traffic control and devices, property restoration and other miscellaneous items will also be necessary to complete the work. A portion of the work in Schedule B on SE 42nd St and Holly Ln will be removed from the project or modified if the City is not able to obtain permanent easements. Bonds required. Prevailing wages.
George Fletcher
Login or create an account
Login or create an account
Owner: City of Mercer Island WA
Published 10/31/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.