ID 728848
King County
Owner Reference: MC-0321767/WP#N06475
Bid Date: 12/03/2024 at 02:00pm
10 Days until bid date
Pre-Bid: 11/13/2024 @ 10:00am
Estimate: $800,000- $1.2M
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The work includes removal and replacement of the existing potable water boxes at terminal gates C9, D1, D2, D4, D7, D8, D10, and D11.The removal scope includes removing the existing cabinets, structural stands, insulation, power, and heat tracing as outlined in the drawings. The construction scope includes providing new potable water box cabinets, structural stands, insulation, power, and heat tracing as outlined in the drawings. The WMBE utilization goal is 10 % for this contract. Bonds required. Prevailing wages.
Procurement
Login or create an account
Owner: Port of Seattle WA
Published 10/31/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450