ID 730402
King County
Owner Reference: 20-3018 / 23-3012.2
Bid Date: 12/04/2024 at 11:00an
13 Days until bid date
Pre-Bid: 11/20/2024 @ 10:00am
Estimate: $1,680,000 - $2,250,000
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The 81st Avenue Pump Station project consists of the replacement of 81st Avenue Pump Station with a higher capacity package pump system. This work includes the decommissioning and removal of the existing pump hardware, the installation of a package pump system, its control systems, and related piping. This work also includes related water, stormwater conveyance, pavement, and pedestrian improvements. The Woodford Avenue Drainage Improvements project will retrofit the storm system around Woodford Ave N and E James Street by adding catch basins and pipes for a new direct storm connection into the James Street Stormwater Pump Station. The project includes installation of two new 72-inch Type II catch basin structures on the east side of Woodford Ave N, an in-line check valve and a knife gate valve with about 30 LF of 18-inch DI stormwater pipe. A new Type I catch basin will be installed on the west side of the road with about 75 LF of 12-inch DI stormwater pipe. Project includes roadway and driveway restoration. Due to proximity to the Mill Creek Middle School. Apprentice utilization requirement is 15%. Bonds required. Prevailing wages.
Stephen Lincoln
Login or create an account
Login or create an account
Owner: City of Kent WA
Published 11/12/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.