635 Zone Control Valve and Booster Pump Station Site 2, Kent, WA

King County

Bid Date: 12/11/2024 at 03:00pm
20 Days until bid date

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Work consists of constructing an approximately 750 square foot concrete masonry unit (CMU) building to include a booster pump station and control valve skid and appurtenances, electrical, plumbing, heating, ventilation and air conditioning, onsite stormwater drainage; site paving, grading, lighting, and security fencing; a new on-site propane generator; propane tank and accessories; gas service line extension; and installation of approximately 1,500 linear feet of 12-inch ductile iron water main. Bonds required. Prevailing wages.

Brent Lewis
 Login or create an account
 Login or create an account

Owner: Lake Meridian Water District WA

Published 11/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.