George Lane Community Fiber Project, Kitsap Co, WA

Kitsap County

Owner Reference: TEL-260579

Bid Date: 11/20/2024 at 01:00pm

Trades: Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Bids are being asked for provision of all necessary labor, equipment and materials required for the installation of the Kitsap PUD Fiber Optic Infrastructure from State Hwy 305 NE along Sandy Hook Rd NE into the George Ln NE community to connect up to 33 residents with fiber to the home service. Project work includes installation of approximately 16,200 feet of total overhead, and approx. 5,200 feet mainline conduit and approximately 5000’ of service drops and other work all as indicated in the plans and specification.

Jim LeCompte
 Login or create an account

Owner: Kitsap Public Utility District (KPUD) WA

Published 10/31/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.