Melcher Street Pump Station Rehabilitation, Port Orchard, WA

Kitsap County

Owner Reference: PW2023-017

Bid Date: 12/17/2024 at 01:00pm
26 Days until bid date

Estimate: $682,000

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The Melcher Street Pump Station Rehabilitation Project removes the two water distribution pressure booster pump/motor sets, control valves, isolation valves, piping, controls, diesel generator, associated generator components, lighting, and electrical panels and branch circuits. The project scope includes installation of new pump/motor sets, controls valves, isolation valves, piping, controls, diesel generator and associated components, variable frequency drives, CT cabinet, automatic and manual transfer switches, portable generator connection box, power panel, lighting, and related power branch circuits, and all other work as described in the plans and specifications. The new diesel generator and associated components are Owner Furnished- Contractor Installed (OFCI) equipment. For a complete list of OFCI equipment refer to Technical Specification section 263213 Engine Generators. The existing generator and associated components can be shipped out of the pump station, and the new generator and associated components shipped into the pump station by way of either the existing east or south ventilation openings. The east ventilation opening is the preferred route. Removal of the existing ventilation louver and screen system will be required. Contractor may trim or cut the existing 6-inch to 8- inch tree, located approximately 100 inches east of the east ventilation opening if needed to utilize the east ventilation opening. Tree stump must remain. Cut as close to the ground as possible. Remove any trimming or cutting debris from the site. If the south shipping route is chosen, removal of a masonry screen wall will be required. Reinstallation of the louver and screen system to a complete and operable condition will be required upon completion of the generator installation. Reconstruction of the masonry screen wall and repair to any damaged structure is required. All work necessary to complete the project. Contractor shall obtain all necessary permits, including building and mechanical permits from the City of Port Orchard, and electrical permit from Washington State Department of Labor and Industries. Contractor shall coordinate with Puget Sound Energy (PSE) who will be providing electrical service upgrades to the building. Work to obtain permits and support the electrical service is incidental to and included in all bid items in the Contract. Bonds required. Prevailing wages.

Chris Hammer
 Login or create an account
 Login or create an account

Owner: City of Port Orchard WA

Published 11/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.