RFQ Parish Creek Fish Barrier Removal, Bremerton, WA

Kitsap County

Bid Date: 12/20/2024 at 03:00pm

Trades: *A&E Architecture & Engineering Services: Professional, Consultant, Consulting & Planning Services

Work consists of preparing preliminary engineering (PE) design for removal of a fish passage barrier culvert on Parish Creek at W Belfair Valley Road. The proposed improvements include removal of an existing 48-inch corrugated metal pipe (CMP) culvert, removal of a concrete spillway, construction of a two-lane bridge, and restoration of approximately 130 feet of Parish Creek using engineered streambed sediments and large woody material (LWM).

David Dinkuhn
 Login or create an account
 Login or create an account

Owner: City of Bremerton WA

Published 12/03/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.