West Poulsbo Stormwater Retrofit Project, Poulsbo, WA

Kitsap County

Owner Reference: CN2024-06

Bid Date: 01/31/2025 at 02:00pm
17 Days until bid date

Estimate: $800,000 to $950,000

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

Construction of the West Poulsbo Stormwater Retrofit which shall consist of, but not be limited to: 1. Mobilization and cleanup at separate locations shown on plans. 2. Clearing and grubbing. 3. Temporary traffic control at locations shown on plans. 4. Removal of structures and obstructions. 5. Installation of 1 CDS Pretreatment Unit 6. Installation of 2 bioretention cells. 7. Installation of 1 Filterra Bioscape 8. Installation of catch basins. 9. Installation of conveyance storm piping. 10. Installation of perforated underdrain pipes. 11. Installation of minor curb, gutter, and stormwater system modifications. 12. Surface restoration including both pavement, trail, and landscape areas. 13. Bioretention and other plantings. 14. Other miscellaneous work as shown on the plans to complete the project. Bonds required. Prevailing wages.

Josh Ranes
 Login or create an account
 Login or create an account

Owner: City of Poulsbo WA

Published 01/10/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.