Phase 2 Membrane Bioreactor WWTP Improvements, Snoqualmie Pass, WA

Kittitas County

Owner Reference: 22072

Bid Date: 11/06/2024 at 10:00am

Pre-Bid: 10/03/2024 @ 10:00am

Estimate: $16.65M

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Installation of two new headworks screens; construction of a new grit removal system; construction of a new equalization basin tank and associated modification and fill within the existing lagoon; construction of a new MBR building expansion including MBR treatment processes, thickening and dewatering equipment, ultraviolet disinfection, and non-potable water system; construction of a new aerobic digester; construction of new sludge drying beds, and site improvements including yard piping, asphalt paving, and stormwater management infrastructure. Bonds required. Prevailing wages.

Dean P, Smith, c/o HLA
 Login or create an account
 Login or create an account

Owner: Snoqualmie Pass Utility District WA

Published 10/07/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.