CBS ID: 739850
Pierce County
Owner Reference: CIP 24-10
Bid Date: 02/18/2025 at 01:00pm
15 Days until bid date
Estimate: $2.5M - $3.0M
Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The project consists of reconstruction of two City owned parcels into a festival parking lot referred to within the contract documents as Area 1 – Alley Base Bid and a park space referred to within the contract documents as Area 2 – Park Add Alternative #1. Improvements in both areas include site demolition, grading, utilities such as water, sewer, stormwater, electrical, communications, site lighting, irrigation, landscape, pervious pavement, concrete walkways and roads, unit pavers, channelization, construction of structures such as garbage enclosures, site walls, monument signs, and trellis structures. Bonds required.
Drew McCarty
Login or create an account
Login or create an account
Owner: City of Sumner WA
Published 01/21/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.