640 Booster Pump Station Project, Arlington, WA

Snohomish County

Owner Reference: P02.491.2

Bid Date: 09/10/2024 at 02:00pm

Pre-Bid: 09/03/2024 @ 09:00am

Estimate: $1,420,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

Work shall include traffic control, pavement saw-cutting and removal, trench excavation, water main installation, electric and communication conduit installation, carpentry and upgrades to an existing wood structure, installation of premanufactured booster pump system, installation of electrical systems, surface restoration including trench patch, testing, and all other incidental work for a complete replacement of the 640 Booster Pump Station project.

Public Works
 Login or create an account

Owner: City of Arlington WA

Published 08/27/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.