Scriber Creek Trail Phase 3 Construction, Lynnwood, WA

Snohomish County

Owner Reference: 3671 FedAidProj HLP-TAPUL 0715(006)

Bid Date: 12/11/2024 at 02:00pm
20 Days until bid date

Pre-Bid: 11/26/2024 @ 10:00am

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The improvement of approximately 21,700 lineal feet of shared use trail between 200TH ST SW and Wilcox Park and approximately 400 lineal feet of paved pathway between the shared use trail and 53rd AVE SW by clearing and grubbing, trimming wetland vegetation, removing structures and obstructions, removing timber bridges and wood abutments, roadway excavation, furnishing and installing steel pin piles, furnishing and installing elevated boardwalk structures, placing aggregates and hot mix asphalt, removing invasive species, landscaping including wetland and wetland buffer enhancement and plantings, installing benches, modifying catch basins, modifying traffic signal system, installing illumination system, erosion control, traffic control, pavement markings, and other work. Bonds required. Prevailing wages.

Monica Thompson
 Login or create an account
 Login or create an account

Owner: City of Lynnwood WA

Published 11/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450