ID 731615
Snohomish County
Bid Date: 12/19/2024 at 11:00am
27 Days until bid date
Estimate: $3,610,000 - $4,610,000
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
Contractor to furnish all labor, materials, and equipment necessary to complete the North Sewer Trunkline in Snohomish, WA. The work to be performed under this contract includes installation of approximately 3,000 linear feet of 18” gravity sewer and 700 linear feet of 12” gravity sewer to divert wastewater flows from the northeast area of the City to the Cemetery Creek Trunkline to the west and to decommission two (2) wastewater pump stations - the Casino Royale Pump Station (PS #14) and Bonneville Pump Station (PS #10). Also included with this work is restoration of all disturbed roadway features and existing utilities including asphalt patching, resurfacing driveways, replacement of curbs and sidewalks, landscape restoration, and potholing and repair of conflicting utilities. Bonds required. Prevailing wages.
Cory Morton
Login or create an account
Login or create an account
Owner: City of Snohomish WA
Published 11/20/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.