74th Avenue Trail, Arlington, WA

Snohomish County

Owner Reference: P02.417

Bid Date: 01/07/2025 at 02:00pm
11 Days until bid date

Pre-Bid: 12/19/2024 @ 10:00am

Estimate: $1.3M

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

Work includes a new 12-foot-wide asphalt trail along the west side of 74th Avenue NE, from the existing trail terminus at 197th St NE to just south of 204th Street NE intersection in the City of Arlington. The work to be performed includes but is not limited to: asphalt trail, illumination, roadway excavation, clearing and grubbing, tree removal, fence, signing, traffic control, landscaping and other work. Bonds required. Prevailing wages.

Linda Taylor
 Login or create an account
 Login or create an account

Owner: City of Arlington WA

Published 12/10/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450